-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):36 -
22
Eastbound from North Dr. to GSP (10.0 mi.):15 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):17 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):11
NorthCentralSouth
-
As of 6:59pm, there's a Crash with Injuries on US 1&9/Tonnelle Avenue northbound North of Paterson Plank Road in North Bergen Twp. 1 right lane of 2 lanes closed.
-
As of 6:57pm, there's a Disabled vehicle on the George Washington Bridge upper level eastbound area of New Jersey Side in Fort Lee. 1 Right lane blocked.
-
As of 6:49pm, there's a Crash on US 1&9/Tonnelle Avenue northbound South of NJ 495/NJ 3 in North Bergen Twp. 1 left lane of 2 lanes closed.
-
As of 4:27pm, there's a Gas main break on NJ 42 southbound North of CR 639/Ganttown Rd in Washington Twp. 1 right lane of 2 lanes closed.
-
As of 7:00pm, there are Delays on the George Washington Bridge upper level eastbound. All lanes open The travel time is 15-20 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 6:54pm, there are Delays on the Garden State Parkway southbound from North of Exit 163 - NJ 17 in Paramus to North of Exit 157 - US 46 in Elmwood Park. All lanes open 4 1/2 mile delay, due to volume.
-
As of 6:49pm, there are Delays on the Garden State Parkway northbound from South of Union Toll Plaza in Hillside Twp to South of Exit 147 - Clinton Ave in East Orange. All lanes open 6 mile delay, due to volume.
-
As of 6:47pm, there are Delays on the George Washington Bridge lower level westbound. All lanes open The travel time is 15 minutes on the Cross Bronx Expressway from Jerome Avenue to Interstate 95 at Interstate 80.
-
As of 6:46pm, there are Delays on the George Washington Bridge upper level westbound. All lanes open The travel time is 15 minutes on the Cross Bronx Expressway from Jerome Avenue to Interstate 95 at Interstate 80.
-
As of 6:45pm, there are Delays at the Lincoln Tunnel south tunnel eastbound from New Jersey Side in Weehawken Twp to New York Side in Manhattan. All lanes open The travel time is 15 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 6:20pm, there are Delays on I-280 westbound from East of Exit 16E - Essex St in Harrison to East of Exit 15 - NJ 21 in Newark. All lanes open.
-
As of 6:04pm, there are Delays on the New Jersey Turnpike - Eastern Spur northbound from North of Southern Mixing Bowl in Newark to North of Interchange 15W - I-280 in Kearny. All lanes open 3 mile delay, due to volume.
-
As of 6:03pm, there are Delays on the New Jersey Turnpike - Eastern Spur southbound from North of Interchange 17E - NJ 3/Lincoln Tunnel to North of Interchange 15X - Secaucus Train Station in Secaucus. All lanes open 2 mile delay, due to volume.
-
As of 5:59pm, there are Delays on the New Jersey Turnpike entering at Interchange 15E - US 1&9 in Newark due to volume.
-
As of 5:56pm, there are Delays on the New Jersey Turnpike exiting at Interchange 3 - NJ 168 in Runnemede due to delays on NJ 168.
-
As of 5:21pm, there are Delays on the Garden State Parkway southbound from North of Exit 147 - Clinton Ave in East Orange to Exit 136 - Stiles St in Cranford Twp. All lanes open 11 mile delay, due to volume.
-
As of 5:02pm, there are Delays on Pulaski Skyway northbound from Broadway to US 1&9 Truck Route/I-280/NJ 7 in Jersey City. All lanes open.
-
As of 7:04pm, there's Roadwork on the New Jersey Turnpike outer roadway northbound Entrance ramp Interchange 8A - NJ 32 in Monroe Twp. All lanes closed to traffic until 6:00 A.M.
-
As of 7:03pm, there's Roadwork on the New Jersey Turnpike outer roadway northbound between South of Interchange 9 - NJ 18 in East Brunswick Twp and South of Interchange 10 - NJ 440/I-287 in Edison Twp. 1 left lanes closed.
-
As of 7:00pm, there's Construction on NJ 70 in both directions from East of NJ 41/CR 154 in Cherry Hill Twp to NJ 38 in Pennsauken Twp. 1 right lane of 2 lanes closed until 5:00 AM.
-
As of 7:00pm, there's Construction on NJ 70 in both directions from CR 607/Maple Ave to NJ 73 in Evesham Twp. 1 right lane of 2 lanes closed until 5:00 AM.
-
As of 6:52pm, there's Roadwork on the New Jersey Turnpike outer roadway southbound Entrance ramp Interchange 9 - NJ 18 in East Brunswick Twp. All lanes closed to traffic until 6:00 A.M.
-
As of 6:51pm, there's Roadwork on the New Jersey Turnpike inner roadway southbound Entrance ramp Thomas Edison Service Area in Woodbridge Twp. Ramp closed to traffic until 6:00 A.M.
-
As of 6:39pm, there's Roadwork on the New Jersey Turnpike outer roadway northbound at Interchange 9 - NJ 18 in East Brunswick Twp. 1 ramp closed.
-
As of 6:22pm, there's Roadwork on the New Jersey Turnpike northbound between North of Interchange 2 - US 322 in West Deptford Twp and South of Interchange 3 - NJ 168 in Deptford Twp. 1 right lane closed.
-
As of 6:00pm, there's Roadwork on the New Jersey Turnpike southbound in the vicinity of Interchange 3 - NJ 168 in Deptford Twp. 1 right lane closed.
-
As of 10:00am, there's Construction on I-287 southbound between South of US 202 and North of Exit 14 - US 22 in Bridgewater Twp. Right shoulder closed until 5:00 AM.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 6:00am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 11:00pm, there's Construction on NJ 23 northbound from CR 618/Kinnelon Rd/Keil Rd in Butler to North of Paterson Hamburg Tpke in West Milford Twp. All lanes open until 11:00 AM on July 25,2025.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 4:02pm, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 7:00am, there's Construction on NJ 47 in both directions from South of US 322/CR 641/High St in Glassboro to NJ 41/Hurfville Rd in Deptford Twp. 1 right lane of 2 lanes closed until 3:30 PM on July 25,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.