-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):33 -
22
Eastbound from North Dr. to GSP (10.0 mi.):13 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):15 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):12
NorthCentralSouth
-
As of 11:51pm, there's a Vehicle fire on US 206 northbound South of NJ 24/CR 513/West Main St in Chester Twp. 2 right lanes of 3 lanes closed.
-
As of 11:04pm, there's a Crash and an Overturned vehicle on the Garden State Parkway southbound North of Toms River Toll Plaza in Toms River Twp. All lanes open.
-
As of 11:00pm, there's a Crash investigation on NJ 66 eastbound NJ 18 in Ocean Twp. All lanes closed.
-
As of 1:18pm, there's a Watermain break on North Service Road southbound in the vicinity of Cargo Road in New York. All lanes closed alternating traffic in northbound lanes.
-
As of 12:02am, there are Delays on the New Jersey Turnpike/I-95 local lanes northbound from South of Exit 72 (NB) - US 9W/US 1&9/US 46 in Englewood to George Washington Bridge in Fort Lee 1 mile delay, due to delays on the George Washington Bridge.
-
As of 11:33pm, there's Construction at the Holland Tunnel north tunnel westbound from New York Side in New York to New Jersey Side in Jersey City. 1 Left lane closed until 5:30 AM.
-
As of 11:21pm, there's Construction at the Holland Tunnel south tunnel eastbound from New Jersey Side in Jersey City to New York Side in Manhattan. 1 Left lane closed until 5:00 AM.
-
As of 10:55pm, there's Construction at the Lincoln Tunnel south tunnel eastbound from New Jersey Side in Weehawken Twp to New York Side in Manhattan. All lanes closed and detoured until 5:00 AM.
-
As of 9:00pm, there's Construction on NJ 17 southbound between North of NJ 4 in Paramus and North of I-80 in Lodi. right lane closed until 4:00 AM.
-
As of 8:00pm, there's Construction on US 22 westbound between East of Terrill Rd in Watchung and East of CR 679/Station Rd in Bridgewater Twp. right lane closed until 4:00 AM.
-
As of 8:00pm, there's Construction on US 9 southbound between North of Ryan Rd/Symmes Rd in Manalapan Twp and North of I-195 in Howell Twp. Left shoulder closed until 5:00 AM.
-
As of 8:00pm, there's Construction on US 22 eastbound between East of CR 679/Station Rd in Bridgewater Twp and East of Terrill Rd in Watchung. left lane closed until 4:00 AM.
-
As of 8:00pm, there's Construction on US 9 northbound between North of I-195 in Howell Twp and North of Ryan Rd/Symmes Rd in Manalapan Twp. Left shoulder closed until 5:00 AM.
-
As of 6:42am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Egg Harbor Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:40am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed September 2025.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.