-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):32 -
22
Eastbound from North Dr. to GSP (10.0 mi.):13 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):15 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):12
NorthCentralSouth
-
As of 2:14am, there's a Crash on the New Jersey Turnpike outer roadway southbound North of Interchange 13A - Newark Liberty International Airport/US 1&9 in Elizabeth. All lanes open.
-
As of 2:01am, there's a Crash on the New Jersey Turnpike outer roadway northbound Exit ramp Interchange 13A - Newark Liberty International Airport/US 1&9 in Elizabeth. All lanes open.
-
As of 12:10am, there's Roadwork on the Garden State Parkway northbound ramps to/from Exit 136 - Stiles St in Cranford Twp. closed for repairs until 6:00 A.M.
-
As of 11:22pm, there's Roadwork on the Garden State Parkway northbound from North of Colonia Service Area in Woodbridge Twp to South of Exit 138 - CR 509 in Kenilworth. 3 Right lanes closed for repairs until 6:00 A.M.
-
As of 8:00pm, there's Construction on I-287 northbound between Exit 21 - I-78 in Bedminster Twp and Exit 35 - NJ 124 in Morristown. 1 to 2 lanes closed until 8:00 AM.
-
As of 8:00pm, there's Construction on I-287 northbound between Exit 21 - I-78 in Bedminster Twp and Exit 35 - NJ 124 in Morristown. at least one lane closed until 9:00 AM.
-
As of 8:00pm, there's Construction on US 22 westbound between West of CR 523/Oldwick Rd in Readington Twp and East of I-78/NJ 173 in Clinton Twp. right lane closed until 8:00 AM.
-
As of 8:00pm, there's Construction on NJ 35 in both directions from North of NJ 36 in Eatontown to North of CR 3/Broadway in Keyport. All lanes open northbound; 1 right lane of 2 lanes closed southbound until 10:00 AM.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 10:00am, there's Construction on NJ 162 northbound North of CR 641/Sea Shore Rd/Bridge Rd in Lower Twp. Right shoulder closed until 2:00 PM.
-
As of 10:00am, there's Construction on US 1 southbound from North of Strawberry St to North of Mulberry St in Trenton. 1 left lane of 2 lanes closed until 2:00 PM.
-
As of 9:00am, there's Construction on US 40 eastbound from West of CR 649/Front St in Elmer to East of CR 611/Dutch Row Rd in Upper Pittsgrove Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 7:30am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 6:00am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 4:02pm, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:14am, there's Operational Activity at the Lincoln Tunnel north tunnel westbound from New York Side in New York to New Jersey Side in Weehawken Twp. All lanes closed until 9:00 A.M.