-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):35 -
22
Eastbound from North Dr. to GSP (10.0 mi.):14 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):17 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):12
NorthCentralSouth
-
As of 9:29am, there's a Traffic Signal Down on US 130 in both directions North of NJ 168 in Haddon Twp. 1 left lane of 2 lanes closed.
-
As of 12:46pm, there are Roving repairs on NJ 38 in both directions from East of US 130 in Pennsauken Twp to US 206 in Southampton Twp. 1 right lane of 2 lanes closed.
-
As of 12:43pm, there are Roving repairs on US 130 in both directions from South of CR 618/Hollywood Av in Carneys Point Twp to I-295 in Logan Twp. All lanes closed and detoured.
-
As of 10:02am, there are Delays on US 9 northbound from South of CR 628/Prospect St to CR 528/Central Ave in Lakewood Twp. All lanes open.
-
As of 9:50am, there are Delays on the George Washington Bridge lower level westbound. All lanes open The travel time is 15 minutes on the Cross Bronx Expressway from Jerome Avenue to Interstate 95 at Interstate 80.
-
As of 9:50am, there are Delays on the George Washington Bridge upper level westbound. All lanes open The travel time is 15 minutes on the Cross Bronx Expressway from Jerome Avenue to Interstate 95 at Interstate 80.
-
As of 9:34am, there are Delays at the Holland Tunnel south tunnel eastbound from New Jersey Side in Jersey City to New York Side in Manhattan. All lanes open The travel time to the New York side is 15 minutes from New Jersey Turnpike Exit 14C and 15 minutes from New Jersey 139 at Tonnelle Circle.
-
As of 8:52am, there are Delays on NJ 42 northbound from Atlantic City Expressway in Washington Twp to I-295 in Bellmawr. All lanes open.
-
As of 8:15am, there are Delays on the Garden State Parkway northbound from Exit 145 - I-280 in East Orange to South of Exit 151 - Watchung St in Bloomfield. All lanes open 5 mile delay, due to roadwork.
-
As of 10:00am, there's Construction on NJ 162 northbound North of CR 641/Sea Shore Rd/Bridge Rd in Lower Twp. Right shoulder closed until 2:00 PM.
-
As of 10:00am, there's Construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. 1 right lane of 2 lanes closed northbound; 1 left lane of 2 lanes closed southbound until 2:30 PM.
-
As of 9:10am, there's Construction on the George Washington Bridge lower level westbound from New York Side in New York to New Jersey Side in Fort Lee. 1 Left lane closed until 2:30 PM.
-
As of 9:09am, there's Construction on the JFK Expressway northbound area of Terminal 5/7 in New York. 1 Left lane closed.
-
As of 9:00am, there's Construction on NJ 49 in both directions NJ 45 in Salem. 1 right lane of 2 lanes closed until 1:00 PM.
-
As of 9:00am, there's Construction on NJ 27 northbound South of CR 623/North Broad St in Elizabeth. 1 center lane of 4 lanes closed until 3:30 PM.
-
As of 8:47am, there's Construction on the George Washington Bridge upper level eastbound from New Jersey Side in Fort Lee to New York Side in New York. 1 Right lane closed until 4:30 PM.
-
As of 8:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Frank S. Farley Service Plaza in Hamilton Twp. 1 Left lane closed until 2:30 PM, MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:30am, there's Construction on US 206 in both directions from CR 523/Lamington Rd in Bedminster Twp to South of Pfizer Way in Peapack-Gladstone. All lanes open northbound; 1 right lane of 2 lanes closed southbound until 2:00 PM.
-
As of 7:00am, there's Construction on NJ 168 northbound CR 534/Church St in Gloucester Twp. Right shoulder closed until 4:00 PM.
-
As of 6:30am, there's Construction on US 130 in both directions in the vicinity of NJ 70 in Collingswood. 1 right lane of 2 lanes closed until 5:00 PM.
-
As of 6:30am, there's Construction on US 130 in both directions in the vicinity of NJ 70 in Collingswood. 1 right lane of 2 lanes closed until 5:00 PM on July 11,2025.
-
As of 6:30am, there's Construction on US 130 in both directions in the vicinity of NJ 70 in Collingswood. Right shoulder closed until 5:00 PM.
-
As of 6:00am, there's Construction on NJ 31 southbound from CR 626/Beaver St to CR 633/Old Allerton Rd in Clinton Twp. 1 left lane of 2 lanes closed until 4:00 PM.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 3:00pm, there's Construction on NJ 31 southbound CR 600/Wescott Dr in Raritan Twp. Right shoulder closed until 11:45 PM on October 31,2025.
-
As of 3:00pm, there's Construction on NJ 31 northbound South of CR 523 in Raritan Twp. Right shoulder closed until 11:45 PM on October 31,2025.
-
As of 8:06pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 10:39am, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until 12:00 AM on July 08,2025.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:29am, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on August 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 12:17am, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:46am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.