-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):05 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):34 -
22
Eastbound from North Dr. to GSP (10.0 mi.):14 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):16 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):11
NorthCentralSouth
-
As of 9:45pm, there's a Disabled vehicle on the Goethals Bridge eastbound New York Side in New York. 1 Center lane blocked.
-
As of 8:59pm, there's a Crash investigation on NJ 29 in both directions North of Paulmier Rd in Delaware Twp. All lanes closed.
-
As of 10:00pm, there are Delays on the New Jersey Turnpike/I-95 express lanes northbound from South of Exit 71 (NB) - NJ 4/Broad Ave in Leonia to George Washington Bridge in Fort Lee 2 mile delay, due to delays on the George Washington Bridge.
-
As of 9:59pm, there are Delays on the New Jersey Turnpike/I-95 local lanes northbound from Exit 71 (NB) - NJ 4/Broad Ave in Leonia to George Washington Bridge in Fort Lee 2 mile delay, due to delays on the George Washington Bridge.
-
As of 9:55pm, there are Delays at the Lincoln Tunnel south tunnel eastbound New Jersey Side - Toll Plaza in Weehawken Twp. All lanes open The travel time is 25 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 9:52pm, there are Delays at the Holland Tunnel south tunnel eastbound New Jersey Side in Jersey City. All lanes open The travel time to the New York side is 20 minutes from New Jersey Turnpike Exit 14C and 20-25 minutes from New Jersey 139 at Tonnelle Circle.
-
As of 9:41pm, there are Delays on the George Washington Bridge upper level eastbound from New Jersey Side in Fort Lee to New York Side in New York. All lanes open The travel time is 60 minutes from Interstate 95 at Interstate 80 to the Alexander Hamilton Bridge.
-
As of 9:40pm, there are Delays on the George Washington Bridge lower level eastbound from New Jersey Side in Fort Lee to New York Side in New York. All lanes open The travel time is 60 minutes on Interstate 95 at Interstate 80 to the Alexander Hamilton Bridge.
-
As of 9:58pm, there's Emergency maintenance on the Garden State Parkway northbound exiting at Exit 145 - I-280 in East Orange. Partial ramp closed for repairs until further notice.
-
As of 9:07pm, there's Roadwork on the Garden State Parkway northbound from Bergen Toll Plaza in Saddle Brook Twp to South of Exit 165A-B - Ridgewood Ave in Paramus. 1 Right lane closed for repairs until 6:00 A.M.
-
As of 9:00pm, there's Construction on I-295 in both directions from North of Exit 57 - US 130 in Hamilton Twp to north of Exit 69 - US 206 in Lawrence Twp. 2 left lanes of 3 lanes closed until 6:00 AM.
-
As of 8:00pm, there's Construction on US 22 eastbound between East of CR 679/Station Rd in Bridgewater Twp and West of CR 651/Warrenville Av in Green Brook Twp. Left shoulder closed until 4:00 AM.
-
As of 8:00pm, there's Construction on US 22 westbound between East of Terrill Rd in Watchung and East of CR 679/Station Rd in Bridgewater Twp. right lane closed until 4:00 AM.
-
As of 8:00pm, there's Construction on I-295 southbound from North of Exit 57 - US 130 in Hamilton Twp to north of Exit 69 - US 206 in Lawrence Twp. 2 left lanes of 3 lanes closed until 6:00 AM.
-
As of 8:00pm, there's Construction on NJ 27 in both directions from I-287 in Edison Twp to CR 669/Bridge St in Metuchen. 1 right lane of 2 lanes closed until 5:00 AM.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:01pm, there's Construction on I-80 eastbound in the vicinity of Allamuchy Rest Area in Byram Twp. Right shoulder closed until 5:00 PM.
-
As of 7:00am, there's Construction on NJ 3 eastbound in the vicinity of NJ 17 in Rutherford. Right shoulder closed until 5:00 PM.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 7:00am, there's Construction on NJ 47 in both directions from South of US 322/CR 641/High St in Glassboro to NJ 41/Hurfville Rd in Deptford Twp. 1 right lane of 2 lanes closed until 3:30 PM on July 25,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 3:00pm, there's Construction on NJ 31 southbound CR 600/Wescott Dr in Raritan Twp. Right shoulder closed until 11:45 PM on October 31,2025.
-
As of 3:00pm, there's Construction on NJ 31 northbound South of CR 523 in Raritan Twp. Right shoulder closed until 11:45 PM on October 31,2025.
-
As of 8:06pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 12:17am, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.